Tested and certified for harsh Australian climate conditions, high heatwaves, and hail impact with up to 25-year manufacturer warranties.
A modular solar, battery and EV-charging system that is quick to install
Real-world benefits engineered for Australian households and microgrid resiliency.
Stackable design for installation in around 15 minutes per the manufacturer, with commissioning in about 5 minutes.
0 ms load-side disruption means your home keeps running when the grid drops out. *Requires the Sigen Gateway used together with the Sigen Energy Controller and Sigen Battery.
Part of the range includes the Sigen EV DC Charging Module and supports V2X bi-directional charging.
Start with one battery and add more, up to 6 per controller.
Controllers are available for both single-phase (3 to 6 kW) and three-phase (5 to 25 kW) homes and businesses.
Built-in diagnostics help installers and owners check system health quickly.
SigenStor integrates your choice of Single-Phase (3โ6 kW) or Three-Phase (5โ25 kW) Energy Controller with 1 to 6 stackable battery modules (5.2 kWh or 7.8 kWh usable each). Pair with the optional Sigen Gateway for 0 ms uninterrupted backup* or EV DC fast charging module.
Verified manufacturer ratings. Click any group to expand technical details.
View the complete side-by-side comparison table including capacity, chemistry, phase and backup speeds.
Sigenergy offers an EV DC Charging Module in the SigenStor range and supports V2X bi-directional charging. Ask us which configuration suits your vehicle and home.
When the grid fails, the system switches to backup power with no noticeable interruption to your loads. *Requires the Sigen Gateway to be installed with the controller and battery.
Yes. Each controller supports 1 to 6 battery modules.
Yes. Three-phase controllers from 5 to 25 kW are available.
Speak with our Australian master electricians to calculate your state battery rebate deductions and custom engineer your backup circuits.
Specifications are supplied by the manufacturer and may change without notice. Images are for illustration. Final system design, suitability and availability are confirmed by a qualified installer.